Waterproofing Solutions
Take a look at the projects listed below in order to gain more information about some of our most recent work, or successful projects from previous years.
If you require any further information or are interested in TREMCO products, please contact us.
Cheshire Oaks Designer Outlet Car Park, Cheshire
Located in Ellesmere Port Cheshire, Cheshire Oaks Designer Outlet is the largest outlet centre in the United Kingdom, with 145 stores and the first designer outlet village in Europe, when it opened in March 1995.
Audi Milton Keynes, Buckinghamshire
New construction to Audi dealership to provide rooftop parking above service bay. Construction was composite metal decking/concrete followed by insulation and a reinforced concrete topping above. The trafficable waterproofing system was installed on top of this.
ABP Southampton, MD7 Southampton, Hampshire
Roof deck waterproofing comprising of a 16,000 m² footprint x 5 level car storage facility. Steel frame and precast planks with grouted connections.
Brambell Building, Bangor University, Wales
Bangor University enlisted the help of TREMCO to help restore a defective roof, which was allowing water to leak into a room causing thousands of pounds worth of damage.
Blackpool Victoria Hospital, Blackpool
Two years after TREMCO’s CP Urethane Waterproofing was applied to the top deck of Blackpool Victoria Hospital’s multi-storey car park. A second treatment of TREMCO’s polyurethane system has also been applied to the remaining internal decks.
Trafalgar Court Guernsey, England
TREMCO’s MMA Rapid Cure Flexible Deck Waterproofing System has enabled specialist installer, Thelwell Flooring, to complete a challenging car-park refurbishment project on the Channel Island of Guernsey.
Hart Shopping Centre Car Park, Fleet
Due to the busy nature of this car park, the project needed to be carried out in phases with each area requiring a fast turnaround to restore it to use. With a cure time of 30 minutes, TREMCO’s MMA Rapid Curing Flexible System was used.
Co-Op, St Helier, Jersey
Most projects have challenges and this project was no different. With just a 3 week turnaround time, the completion of the Co-op car park in Jersey was completed using TREMCO’s MMA Rapid Cure Flexible System.
ABS Southampton, Fifth Facility
tremco illbruck were asked to waterproof the roof deck of a multi storey car park storage facility of lightweight construction at Southampton Dock. The facility is designed as a holding area for cars for export by ship which are delivered to the docks by rail transporter.
Furnival Gate, Sheffield
A busy city centre multi-storey car park in Yorkshire has undergone a two-phase refurbishment programme to upgrade and weather-proof its top deck; with the MMA Rapid Cure Flexible System from TREMCO being preferred by the specialist contractor involved..
St. Mark's Car Park, Wrexham
tremco illbruck products were specified on the existing 1960’s structure in Wrexham. The car park had been built without a waterproofing layer and as a result was allowing water to leak through the structure and was in need of renovation.
Lonza Car Park, Slough
The project consists of a brand new MSCP for pharmaceutical company Lonza, who due to expanding their facilities on the Slough Estate require additional staff parking.
Quayside Tower, Birmingham
TREMCO MMA Rapid Cure Flexible System was carefully chosen for use on the Quayside Tower, Birmingham.
St. Stephen's MSCP, Norwich
St Stephens MSCP is a 260 space car park situated in Norwich city centre and popular with shoppers and businesses.
45 Grosvenor Road, St Albans
Car park comprises asphalt surfaced ground floor podium deck with office above and ramp down to basement levels.
John Lewis MSCP, Exeter
Tremco systems were tailored to meet the different requirements of various parts of the structure; in high-demand areas such as the spiral ramps, a crushed basalt aggregate was used to meet the increased wear and traction demands.
Bittoms MSCP - Kingston upon Thames, Surrey
The 15-storey Bittoms MSCP in Kingston upon Thames town centre was refurbished with a total of 18,000 m² of internal deck coating to lightly brush-finished concrete which had never previously been coated.
Livery Street MSCP, Birmingham
Livery Street MSCP was selected by Birmingham City Council as their flagship refurbishment to start the revamp of their city centre MSCPs.
Gatwick Airport MSCP 1
Following the successful completion of MSCP 3 at the short-stay parking of Gatwick Airport South Terminal in 2005, the refurbishment of MSCP 1 was carried out the following year.
Dublin Airport, Car Park B - Dublin, Ireland
Following the success of the works completed at Dublin Multi-Storey Car Park A in 2005, Car Park B was refurbished in 2006.
Gatwick Airport MSCP 3
The four internal decks of MSCP 3 at the short-stay parking at Gatwick Airport South Terminal were coated with TREMCO’s MMA Rapid Cure Flexible System as part of a major refurbishment.

Dublin Airport, Car Park A - Dublin, Ireland
The existing failed waterproofing system was removed by planing and vacuum blasting of the concrete to remove surface contamination.